Return to site

Morongo casino resort spa local regulations

broken image
broken image

The following are general requirements that apply to this project:ġ. Project Schedule to be included with contractor submittal package

broken image

The following attachments are included as a part of this RFP:Īttachment A – Proposed Cooling Tower Footing and Framing PlanĪttachment C – Equipment Specifications & Cut SheetsĪttachment D – Condenser Water Piping SchematicĪttachment E – Electrical Single Line DiagramĪttachment F – Proposed Cooling Tower Location

broken image

broken image